01/29/2021, 3:52 PMjob_id) from the job table in the system database, so that the next time the DAG runs, there will be no previous state, and they'll automatically start from scratch
2. Manually SSH into the machine and run meltano schedule run <name> --full-refresh for each schedule, but first pause the DAGs in the Airflow web UI to prevent them from accidentally running while the full refresh is running, which could result in duplicate records. Once we have https://gitlab.com/meltano/meltano/-/issues/2356, pausing shouldn't be necessary anymoredouwe_maan
01/29/2021, 3:53 PMzlatan
01/29/2021, 3:56 PMdouwe_maan
01/29/2021, 3:58 PMpsql or any graphical Postgres UI, you'll see a job table with a row for every schedule run, with a job_id corresponding to the schedule name, a unique run_id , and a payload containing (among other things) singer_state .
If you delete all records for a given job_id there, the next schedule run will not be able to find any old singer state and will start from scratch.
If you'd like to fully refresh all schedules, you can delete all rows in that tablezlatan
01/29/2021, 4:36 PMzlatan
01/29/2021, 6:16 PMdouwe_maan
01/29/2021, 6:32 PMdouwe_maan
01/29/2021, 6:33 PMzlatan
01/29/2021, 6:35 PMzlatan
01/29/2021, 6:36 PMdouwe_maan
01/29/2021, 6:36 PMdouwe_maan
01/29/2021, 6:36 PMdouwe_maan
01/29/2021, 6:37 PMjob_id, does it not pick up state?zlatan
01/29/2021, 6:37 PMzlatan
01/29/2021, 6:39 PMdouwe_maan
01/29/2021, 6:40 PMzlatan
01/29/2021, 6:40 PMzlatan
01/29/2021, 6:40 PMdouwe_maan
01/29/2021, 6:40 PMjob and have job_id and run_id columns: https://meltano.slack.com/archives/CFG3C3C66/p1611935913067200?thread_ts=1611934620.063300&cid=CFG3C3C66douwe_maan
01/29/2021, 6:40 PMdouwe_maan
01/29/2021, 6:40 PMzlatan
01/29/2021, 6:41 PMzlatan
01/29/2021, 6:41 PMdouwe_maan
01/29/2021, 6:42 PMzlatan
01/29/2021, 6:42 PMzlatan
01/29/2021, 6:42 PMdouwe_maan
01/29/2021, 6:43 PMMELTANO_DATABASE_URI env varzlatan
01/29/2021, 6:47 PMzlatan
01/29/2021, 6:47 PMdouwe_maan
01/29/2021, 6:47 PM.meltano/meltano.dbdouwe_maan
01/29/2021, 6:47 PMzlatan
01/29/2021, 6:47 PMdouwe_maan
01/29/2021, 6:48 PMzlatan
01/29/2021, 6:48 PMdouwe_maan
01/29/2021, 6:48 PMzlatan
01/29/2021, 6:48 PMdouwe_maan
01/29/2021, 6:48 PMdouwe_maan
01/29/2021, 6:48 PMzlatan
01/29/2021, 6:57 PMstart_date on the schedules level is overwritten by the extractor's default config start_date.
As shown on picture - this date is not taken into consideration. Is this to be expected as behavior?douwe_maan
01/29/2021, 6:58 PMstart_date doesn't actually do anything, it just has to be in the past: https://gitlab.com/meltano/meltano/-/issues/2529zlatan
01/29/2021, 6:59 PMdouwe_maan
01/29/2021, 7:00 PMstart_date configured (under the plugin definition's config ), but the start_date s under schedules really don't matter, they can be the same for every schedule, as long as it's in the past, because otherwise the pipeline won't run until that dayzlatan